欢迎登录材料期刊网

材料期刊网

高级检索

降低制造成本是复合材料推广使用的必经之路,建立成本估算模型是定量评价复合材料工艺成本的基础和降低复合材料工艺成本的重要技术手段.复合材料制造设计的核心就是针对特定产品选择最佳的材料和制造工艺,实现产品性能与成本的最佳平衡.而成本估算模型可以在工艺过程与成本之间建立定量关系,这是制造设计的关键组成部分.本文对国外先进复合材料制造成本估算模型研究的现状进行了总结和评述,给出了主要成本估算模型的类型、建模方法以及各自的特点及适用范围,提出了基于成本估算模型的工艺-性能-成本集成分析的未来研究方向.

参考文献

[1] GUTOWSKI T G.Advanced composites manufactu-ring[M].New York:John Wile & Sons Inc,,1997
[2] VELDSMAN G;BASSON A H.The role of cost estimation in the design for RTM[A].Naples Italy,1998
[3] STEWART R D;WYSKIDA R M;JOHANNES J D.Cost estimator's reference manual[M].New York:John Wiley & Sons,1995
[4] DEAN E B.Parametric cost analysis:a design function[A].San Diego:CA,1989
[5] N. Bernet;M. D. Wakeman;P.-E. Bourban .An integrated cost and consolidation model for commingled yarn based composites[J].Composites, Part A. Applied science and manufacturing,2002(4):495-506.
[6] WANG E;GUTOWSKI T .Cost comparison between thermoplastic and thermoset composite[J][J].SAMPE Journal,1990,26(06):19-26.
[7] FOLEY M F;BERNARDON E .Thermoplastic composite manufacturing cost analysis for the design of cost effective automated systems[J][J].SAMPE Journal,1990,6(04):67-74.
[8] HAN Y F;XING Z P;CHATURVEDI M C .Oxidation resistance and microstructure of Ni Cr Al Y coating on Ni3Al based alloy[J].Materials Science and Engineering,1997,A239-240:871-876.
[9] HESS R W;ROMANOFF H P· .Advanced airframe structural materials:a primer and cost estimating methodology[R].Rept.R-4016-AF.Santa Monica,Ca:Rand Corp,,1991.
[10] NASA .Paramtric cst stimating handk[OL].http://www.jsc.nasa.gov/bu2/pcehg.html,1996.
[11] GUTOWSKI T G;HENDERSON R;SHIPP C .Manufacturing costs for advanced composites aerospace parts[J][J].SAMPE Journal,1991,27(03):37-43.
[12] ROHANI M;DEAN E B.Toward manufacturing and cost considerations in multidisciplinary aircraft design[A].Salt Lake City:Utah,1996
[13] Anon.PRICE H Reference Manual[M].Moorestown:General Electric Company,NJ,,1988
[14] LeBLANC D J.Advanced composites cost estimating manual[M].AFFDLTR-76-87,Northrop Corporation
[15] RAMKUMAR R L;DEWHURST P;SAHA S K.Manufacturing cost model for composites[A].,1991:982-994.
[16] MABSON G E;FLYNN B W .The use of COSTADE in developing composite commercial aircraft fuselage structures[A].Hilton Head:SC,1994,3:1384-1393.
[17] GUTOWSKI T G;HOULT D;DILLON G et al.Development of a theoretical cost model for advanced composite fabrication[J].Composites Manufacturing,1994,5(04):231-239.
[18] DAVIS J J;SHUART M;BOWLES D .Proc.5th NASA/DoD Advanced Composites Technology Conference[C].WA.Seattle.NASA Conference Publication 3294,1995,1
[19] BUSCH J V;POGGIALI B.Microcomputer based cost estimation for composite fabrication processes[A].Los Angeles:CA,1986:232-244.
[20] BUSCH J V.Micro computer based cost estimation for the SMC process[A].Dearborn:MI,1986:141-148.
[21] FOLEY M;BERNARDON E.Computer-based manufacturing cost analysis for the fabrication of thermoplastic composite structures[A].San Diego:CA,1990:1-31.
[22] PAS J W;HAFFNER S M;GUTOWSKI T G .WEB based cost estimation models for advanced composites[R].NSF Conference Paper,,2001.
[23] PAS J W .WEB based cost estimation models for the manufacturing of advanced composites[D].MIT,,2001.
[24] NEOH E T;GUTOWSKI T G;DILLON G.Framework for estimating fabrication time of advanced composites manufacturing processes[A].Anaheim:CA,,1995
[25] NOTON B R.ICAM:manufacturing cost/design guide[M].Vol.Ⅰ,Ⅱand Ⅲ.AFML-TR-76-227,Contract no.F33615-75-C-5194,Prepared by Battell-e's Columbus Laboratories,Columbus,OH,1979
[26] OSTWALD P F.AM cost estimator[M].Penton Publishing Inc,,1988
[27] POLGAR K C .Simplified time estimation for basic machining operations[Z].麻省理工学院,1996.
[28] POLITIS D .An economic and environmental evaluation of aluminum designs for automotive structures[D].MIT:M.S.Thesis,1995.
[29] BUSCH J V;FIELD F R III.Technical cost modeling.blow molding Handbook[M].New York:Hanser Publishers,1989:839-871.
[30] CLARK J P;FIELD F R III.Fundamentals in process-based cost modeling[M].麻省理工学院,2000
[31] WILLDEN K .Advanced technology composite fuselage manufacturing[R][R].Report CR-4735,NASA,1997.
[32] HAFFNER S M;GUTOWSKI T G.Manufacturing time estimation laws for composite materials[C].NSF Conference[C],,1999
[33] HAFFNER S M;GUTOWSKI T G.Automated cost estimation for advanced composite materials[C].NSF Conference[C],,1998
[34] KANG P A .A Technical and economic analysis of structural composite use in automotive body-in-white applications[D].麻省理工学院,1998.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%