欢迎登录材料期刊网

材料期刊网

高级检索

利用电触点法研究了工艺参数对消失模铸造AZ91合金的流动形态和流动速度的影响.结果表明,AZ91合金熔液以凸弧形平稳地向前逐层置换泡沫,这是由于裂解产物在流动前沿尤其模样边缘处的大量堆积造成的.充型时间随浇注温度、真空度的提高而变短.充型过程中充型速度呈现交替变化.以熔融金属作为振子,熔体和泡沫模之间的气层作为弹簧建立弹簧-振子模型,可以诠释充型速度的交替变化.

参考文献

[1] Shivkumar S;Yao X;Makhlouf M .Polymer-Melt Interactions During Casting Formation in the Lost Foam Process[J].Scripta Metallurgica et Materialia,1995,33(01):39-46.
[2] Goria C A .Coating permeability:A critical parameter of the evaporative pattern process[J].AFS Transactions,1986,101:589-597.
[3] Sun Y;Tsai H L;Askeland D R .Investigation of Wetting and Wicking Properties of Refractory Coating in the EPC Process[J].AFS Transactions,1992,100:297-308.
[4] Liu J;Ramsay C W;Askeland D R .Effects of Foam Density and Density Gradients on Metal Fill in the LFC Process[J].AFS Transactions,1997,105:435-442.
[5] E. N. Pan;G. L. Sheu .Mold Filling Behavior in Vertical Gating Lost Foam Aluminum Alloy[J].Transactions of the American Foundrymen's Society,2001(109):1503-1521.
[6] Liu Z L;Hu J Y;Ding W J et al.Effect of Processing Parameters on Mold Filling in Magnesium Alloy EPC Process[J].AFS Transactions,2001,101:1-14.
[7] 董选普 .镁合金消失模铸造模样热解特性及其与金属的界面作用[D].武汉:华中科技大学,2004.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%