欢迎登录材料期刊网

材料期刊网

高级检索

从电沉积法修复混凝土裂缝的机理、电沉积溶液的选择、电沉积效果的表征及其影响因素、电沉积方法修复后混凝土性能的改善4个方面论述了电化学沉积法修复混凝土裂缝的研究进展.探讨了对电沉积法修复混凝土裂缝的机理,分析了电沉积溶液的选择要求,对比了不同学者关于电沉积效果的表征方法及其影响因素,并归纳了电沉积方法修复后混凝土性能的改善,最后提出电沉积方法对混凝土裂缝的修复机制、愈合效果评价、电沉积层与钢筋混凝土结构基体材料界面结合机制等方面还有待进一步的研究.

参考文献

[1] Bhalerao K;Shen W et al.A probabilistic muhiparameter framework for the modeling of fatigue crack growth in concrete[J].Cement and Concrete Composites,2003,25:607.
[2] Emmanuel Denarie;Christophe Cecote;Christian Huet .Characterization of creep and crack growth interactions in the fracture behavior of concrete[J].Cement and Concrete Research,2006(3):571-575.
[3] M.V.K.V. Prasad;C.S. Krishnamoorphy .Computational model for discrete crack growth in plain and reinforced concrete[J].Computer Methods in Applied Mechanics and Engineering,2002(25/26):2699-2725.
[4] Joosef Leppanen .Concrete subjected to projectile and fragment impacts:Modelling of crack softening and strain rate dependency in tension[J].International Journal of Impact Engineering,2006,32:1828.
[5] Trisha Sain;J. M. Chandra Kishen .Probabilistic assessment of fatigue crack growth in concrete[J].International Journal of Fatigue,2008(12):2156-2164.
[6] 蒋元驹;韩素芳.混凝土工程病害与修补加固[M].北京:海洋出版社,1996:1.
[7] 姚继涛;马永欣.建筑物可靠性鉴定和加固--基本原理和方法[M].北京:科学出版社,2003:266.
[8] Osama Jannadi M et al.A concrete pier:Case history of failure and repair[J].Construction and Building Materials,2000,14(01):7.
[9] Michael G Grantham.Diagnosis,inspection,testing and repair of reinforced concrete structures[M].John Newman Ban Seng Choo.Adv Concr Techn Set,Burlington,2003:1.
[10] Fowler D W .Polymers in concrete:A vision for the 21st century[J].Cement and Concrete Composites,1999,21(5-6):449.
[11] 吴载昌.电镀非晶态合金展望[J].材料保护,1990(01):71.
[12] 俞素芬,雷军,范伟光,吴卫,张可敏.化学镀Ni-W-P合金沉积机理初探[J].材料保护,2001(12):18-19.
[13] 何湘柱,夏畅斌,王红军,龚竹清,蒋汉瀛.非晶态Fe-Ni-Cr合金电沉积的研究[J].材料保护,2002(01):5-7.
[14] Sasaki H;Yokoda M.Repair method of marine reinforced concrete by electrodeposition technique[A].Japan,1992:849.
[15] Yokoda M;Fukute T.Rehabilitation and protection of marine oncrete structures using electrodeposition method[A].RELEM.Melboumr,1992:213.
[16] Nobuaki Otsuki;Makoto Hisada;Jae-Suk Ryu;Eiji Banshoya .Rehabilitation of Concrete Cracks by Electrodeposition[J].Concrete international,1999(3):58-63.
[17] J.-S. Ryu .An experimental study on the repair of concrete crack by electrochemical technique[J].Materials and structures,2001(241):433-437.
[18] Nobuaki Otsuki;Member;ASCE .USE OF ELECTRODEPOSITION FOR PEPAIR OF CONCRETE WITH SHRINKAGE CRACKS[J].Journal of Materials in Civil Engineering,2001(2):136-143.
[19] Jae-Suk Ryu;Nobuaki Otsuki .Crack closure of reinforced concrete by electrodeposition technique[J].Cement and Concrete Research,2002(1):159-164.
[20] Otsuki N .Investigation of durability of reinforced concrete member on land repaird by electrodeposition method[J].Journal of Materials Science Society of Japan,2002,51(11):1278.
[21] J.S. Ryou;P. Monteiro .Electrodeposition as a rehabilitation method for concrete materials[J].Canadian Journal of Civil Engineering,2004(5):776-781.
[22] Ryu J S;Otsuki N.Application of electroduposition technique for concrete rehabilitation[A].Spain:Barcelona,2000
[23] Ryu J S;Otsuki N.Crack closure and chloride extraction of concrete by electrodeposition method[A].Seoul,Korea,1999
[24] Ryou J .New waterproofing technique for leaking concrete[J].Journal of Materials Science Letters,2003,22:1023.
[25] Otsuki N;Ryu J S .Use of electrodeposition for repair of concrete with shrinkage cracks[J].Mater Civil Eng,2001,13(02):136.
[26] Ryu J S .Influence of crack width,cover depth,water cement ratio and temperature on the formation of electrodeposition on the concrete surface[J].Magazine of Concrete Research,2003,55(01):35.
[27] Takahiro NISHIDA;Nobuaki OTSUKI;Akihiro KONAGAI .Corrosion Rate of Steel Bar at Joint and Its Control Method in Reinforced Concrete Members Induced by Carbonation[J].材料,2003(9):1067-1074.
[28] Ryou J S;Nobuaki Otsukk .Experimental study on repair of concrete structural members by electrochemical method[J].Scripta Materialia,2005,52:1123.
[29] 姚武,郑晓芳.电沉积法修复混凝土裂缝的初步进展[J].中国科学基金,2005(04):216-219.
[30] 蒋正武,孙振平,王培铭.电化学沉积法修复钢筋混凝土裂缝的机理[J].同济大学学报(自然科学版),2004(11):1471-1475.
[31] 储洪强,蒋林华.利用电沉积方法修复混凝土裂缝试验研究[J].河海大学学报(自然科学版),2005(03):310-313.
[32] 储洪强 .电沉积方法修复混凝土裂缝技术研究[D].河海大学,2005.
[33] 蒋正武 等.电化学沉积法修复钢筋混凝土裂缝的愈合效果[J].东南大学学报(自然科学版),2006,36(增刊):129.
[34] 蒋林华,储洪强.混凝土参数对沉积效果的影响[J].水利水电科技进展,2005(02):23-25.
[35] 储洪强,蒋林华,华卫兵.辅助电极及电极距离对沉积效果的影响[J].建筑材料学报,2005(04):456-461.
[36] 宋显辉,张华,李卓球.碳纤维增强混凝土裂纹钝化的有限元模拟与实验研究[J].华中科技大学学报(城市科学版),2003(03):26-29.
[37] 储洪强,蒋林华,喻林.电沉积处理对砂浆比表面积及微孔结构的影响[J].建筑材料学报,2006(05):627-632.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%