欢迎登录材料期刊网

材料期刊网

高级检索

传统的阳极泥熔炼存在物料占用多,生产周期长,生产成本高、产能低等问题。根据富氧底吹强化熔炼提高系统处理能力、满足生产要求的思路,对富氧强化引起的渣线侵蚀问题进行了试验悁究。通过在渣中配入一定量的PbO替代侵蚀性强的纯碱与萤石,取得了良好效果。悁究了氧化铅配入量、熔炼时间、熔化温度、焦丁的配入及其反应温度、氧气参与等条件对还原熔炼的影响。

The traditional anode mud smelting process has some disadvantages, such as long production period, high production cost and low productivity. Because the oxygen bottom blowing melting process can improve the treatment capacity of the system and meet the production requirement, the problem of the slag line erosion caused by oxygen enrichment was investigated. Lead oxide was added in the slag instead of soda and fluorite with strong corrosion and a good effect was gained. The influences of lead oxide and the amount, melting time, melting temperature, coke nut amount and its reaction temperature and the oxygen inlet on the reduction-smelting were studied.

参考文献

[1] 关通.从铅阳极泥中回收银[J].湿法冶金,2001(04):179-181.
[2] 杨显万;邱定蕃.湿法冶金[M].北京:冶金工业出版社,1998:400.
[3] 王光忠,陈海军.铅阳极泥富氧底吹熔炼实践[J].湖南有色金属,2012(01):37-39.
[4] 于仁波;张祖贤;毛裕文 .CaF2-CaO-Al2O3-MgO-SiO2五元电渣渣系粘度的研究[J].钢铁研究学报,1989,1(02):9-14.
[5] 焦志远,张波,乔进峰,张朝晖,巨建涛.CaF2-SiO2-Al2O3-CaO-MgO五元渣系黏度的试验研究[J].钢铁研究学报,2013(06):29-34.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%