欢迎登录材料期刊网

材料期刊网

高级检索

Aiming at the limitations of the traditional mathematical model for production planning, a novel optimizationmodel is proposed to improve the efficiency and performance for production planning in steelmaking and continuous casting (SCC) process. The optimization model combined with parallel-backward inferring algorithm and genetic algorithmis described. To analyze and evaluate the production plans, a simulation model based on cellular automata is presented. And then, the integrated system including the production plan optimization model and the simulation model is introduced to evaluate and adjust the production plan on-line. The test with production data in a steel plant shows that the optimization model demonstrates ability to deal with time uncertainty in production planning and to set up a conflict-free production plan, and the integrated system provides a useful tool for dynamically drawing and adjustinga production plan on-line. The average staying time of the production plan is about 5% shorter than that in a practical process.

参考文献

[1] Lixin Tang;Jiyin Liu;Aiying Rong;Zihou Yang .A review of planning and scheduling systems and methods for integrated steel production[J].European Journal of Operational Research,2001(1):1-20.
[2] Arezoo Atighehchian;Mehdi Bijari;Hamed Tarkesh .A Novel Hybrid Algorithm For Scheduling Steel-making Continuous Casting Production[J].Computers & operations research,2009(8):2450-2461.
[3] Lixin Tang;Jiyin Liu;Aiying Rong;Zihou Yang .A mathematical programming model for scheduling steelmaking-continuous casting production[J].European Journal of Operational Research,2000(2):423-435.
[4] Tang L;Luh P B;Liu J et al.Steel-Making Process Scheduling Using Lagrangian Relaxation[J].International Journal of Production Research,2002,40(01):55.
[5] A. Bellabdaoui;J. Teghem .A mixed-integer linear programming model for the continuous casting planning[J].International journal of production economics,2006(2):260-270.
[6] YANG Jing-ming,CHE Hai-jun,DOU Fu-ping,ZHOU Tao.Genetic Algorithm-Based Optimization Used in Rolling Schedule[J].钢铁研究学报(英文版),2008(02):18-22.
[7] Ivan Ferretti;Simone Zanoni;Lucio Zavanella .Production-inventory scheduling using Ant System metaheuristic[J].International journal of production economics,2006(2):317-326.
[8] Mohanty P P .An Agent-Oriented Approach to Resolve the Production Planning Complexities for a Modern Steel Manufacturing System[J].International Journal of Advanced Manufacturing Technology,2004,24(3-4):199.
[9] Lixin Tang;Gongshu Wang .Decision support system for the batching problems of steelmaking and continuous-casting production[J].Omega: The international journal of management science,2008(6):976-991.
[10] 郑忠,何腊梅,高小强.炼钢生产物流系统仿真的细胞自动机模型[J].钢铁,2004(11):75-78.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%